|
US
|
COLD MILL
|
1992
|
Main Drives, Mill Master, AGC, Screws, Coiler Control, Thickness
|
|
|
OH
|
77” Cold Mill
|
1992
|
New MG Set Control, AGC, Mill Master, New Screwdowns, Interstand Tension
|
|
|
|
OH
|
84” Cold Mill
|
1993
|
Drives, AGC, HMI, Spray control, Interstand tension, Coiler control, Level 1
|
|
OH
|
Skin Pass Mill
|
1993
|
Drives, Mill Master, HGG, AGC, Roll Bending, Elongation, Control Desk, HMI |
|
|
Timet
|
PA
|
Z Mill
|
1994
|
Main Drives MG Replacment,Mill Master, AGC, HGC, Shape & Thickness Control, Gauges, Setup Model, Pulpit
|
|
|
PA
|
Z Mill
|
1994
|
Main Drive MG Set Control, Mill Master, AGC, HGC, Shape & Thickness Control, Gauges, Setup Model, Pulpit
|
|
ATI
|
PA
|
Plate Mill
|
1995
|
Mill Master, Screwdowns, PLC, HMI, Table drives ,Pass Schedule calc’s. Furnace control,
|
|
Rajinder
|
India
|
HSM
|
1995
|
Mill Master stand control, 6 Stand Roll force cylinders, AGC, HGC, HMI, DEC Alpha L2
|
|
USS Irvin
|
PA
|
84” HSM
|
1996
|
Main MG Set Control, Mill Master, New Rougher & Edger Drives, New Coilers & Table drives,
|
|
|
OH
|
80” HSM
|
1997
|
MG Set Upgrade, Level 1 & 2, Stand control, Models, Pulpit
|
|
|
OH
|
84” PL
|
1998
|
Drives , Level 1, HMI, PLC, OCS, L2 Interface, MCC
|
|
USS
|
PA
|
Rougher
|
1998
|
Mill Master, Level 1, Side Guides Drives upgrade
|
|
WPI |
OH
|
48” Galv. Line
|
1998
|
New PCR, New Drives, PLC, HMI, Sub-Stations, SWG,
|
|
USS
|
PA
|
Coiler
|
1999
|
Level 1, HMI, PLC, Pulpit, Automax SW upgrade,
|
|
|
OH
|
Roughing Mill
|
2000
|
Replace GE Directomatic stand controller with Automax Mill Master, Level 1, PLC, Remote I/O , Slab Tracking, Edger control, Screw Pos., Reg. Spray Control
|
|
USS ET
|
PA
|
Skip Hoist
|
2001
|
New Drives, Redundant PLC, HMI, New feedback & position devices.
|
|
|
OH
|
Caster
|
2001
|
Drives, PLC, HMI, mold level control, Operator control
|
|
USS
|
PA
|
Pickle Line
|
2002
|
Level 1&2 ,New Drives,PLC, HMI, Operator control, MCC
|
|
USS
|
PA
|
Galv. Line Temper Mill |
2003
|
New PCR, Level 1, HMI, Drives, AGC, Tension Control, Elongation RECO
|
|
ISG
|
OH
|
HSM
|
2004
|
MG Set Upgrade, Level 1 & 2 Mill Master stand control, Mill Models, New Pulpit |
|
ATI
|
PA
|
Plate Mill
|
2005
|
Mill Master, MG Set Main Drives Control, Table drives PLC, HMI, Screwdowns
|
|
USS
|
PA
|
84” PL
|
2006
|
Drives, Level 1, PLC, HMI, Operator control, MCC
|
|
IPSCO
|
KY
|
Pipe Mill
|
2006
|
New Drives, Flying cutoff control, PLC, HMI, OCS, Level 1 Remote I/O MCC
|
|
USS
|
PA
|
HSM
|
2006
|
Drives upgrade, Level 1&2, PLC, HMI, Down Coilers, screws,
|
|
AK Steel
|
PA
|
HSM
|
2007
|
MG Set Upgrade, Mill master, PLC, HMI, MCC, Pulpit
|
|
ATI
|
MA
|
Z Mill
|
2007
|
Drives, AGC, PLC, HMI, Coilers
|
|
Arcelor Mittal
|
OH
|
HSM
|
2007
|
Drives upgrade, level 1&2 , PLC, HMI, Screws, loopers, Coilers New Pulpit |
|
AK Steel
|
PA
|
TCM
|
2008
|
MG Set upgrade, Screws, HMI, PLC, OCS
|
|
USS
|
PA
|
Coke Works
|
2010
|
TK Uhde OEM TURNKEY Automation
|
|
Arcelor Mittal
|
OH
|
TCM
|
2010
|
Drives, Mill Master PLC , HMI, Level 1&2 Shape control, AGC |
|
USS |
OH
|
Q&T Finishing Line
|
2011
|
Level 1 mill auxiliaries, PLC, HMI, OCS, Material tracking, Robot integration |